| General Information: Stone Artisan Park |
Dhrangadhra, Dist: Surendranagar and Ambaji, Dist: Palanpur
Both the Stone Artisan Park is being conceptualized and developed in Collaboration with following agencies. Who have contributed their knowledge in developing park
- GITCO – Gujarat Industrial and Technical Consultancy Organization Limited
The Commissioner of Geology & Mining, Govt. of Gujarat assigned to GITCO the task of undertaking a detailed study of the activity/industry and preparing a comprehensive Project Report for setting up the Stone Artisan Parks at Ambaji and Dhrangadhra, the two prominent centres for this artisan activity in the State.
http://gitco.co.in/
- GMDC - Gujarat Mineral Development Corporation
Construction of both Stone Artisan Park is completed in consultation with GMDC
http://www.gmdcltd.com
- CEPT – Centre for Environmental Planning & Technology
Designing of Stone Artisan Park is conceptualized by CEPT.
http://www.brdsindia.com/
- The Society has been formed in the name of Dhrangadhra and Ambaji Stone Artisan Park for its smooth administration.
- Infrastructure facility
|
| Description |
Ambaji Stone Park |
Dhrangadhra Stone Park |
| Address |
Ambaji Stone Artisan Park
Dist: Banaskantha, Taluko:Danta
Village: Kumbhariya
Survey no: 211
Area Covered: 16390 Sq. Mtrs |
Dhrangadhra Stone Artisan Park
Dist: Surendranagar, Taluko: Dhrangadhra
Village: Dhrangadhra
Survey no: 1557
Area Covered: 54636 Sq. Mts. |
| Facilities |
• Shed – 28
• Administrative Building
• Production Center
• Canteen
• Computer room
• Gallery
• 3 Shop
• Over head & Under ground water tank
• Electric room
• Telephone
• Outsourced Security |
• Shed – 37
• Administrative Building
• Production Center
• Computer room
• Canteen
• Gallery
• 3 Shop
• Over head & Underground water tank
• Electric room
• Telephone
• Outsourced Security |
| Machineries |
(Heavy duty Lethe machine, Drill machine, Stone cutter, Radial drilling machine, electric tools, pneumatic tools etc) |
| Fund Allocation by GMDC |
Rs 9.39 Crore |
| Expenditure till date |
Rs 8.21 Crore |
| Provision of Fund in the year 2009-10 |
Rs 120 Lacs / and Rs. 414.78 as a new service |
|
| |
|
|
 |
|
 |
|
|
|
|
| |
|
|
|
|